Dredging work in areas of navigation at Port of Guaymas
For the impact of Hurricane "Jimena" in the city of Guaymas happened last September, was necessary to realize dredging work in the areas of navigation in the port of Guaymas, to maintain the depth of the docks and turning basin and access channel.
Dragamex Company was competition winner to realize dredging work; this began with the moved of equipment “Puerto Mexico”, “Pacific” and “Flevo to the Port of Guaymas on November 08th, 2009.
Currently this equipment are working 24 hours a day every day, the total volume to be dredged is approximately 735 thousand cubic meters and with the 3 equipment, together provide a capability of 11,800 tons of dredging product.